The managing director of CPB Contractors says multi-billion dollar infrastructure work is coming unstuck because some big ...
The countdown is on for Melbourne's game-changing Metro Tunnel, with hundreds of drivers now trained and raring to go. More ...
The Iconic has halved its standard delivery time in Melbourne’s metro area, reducing it from four to just one to two days.
Hosted on MSN6mon
Melbourne's Metro Rail Tunnel budget blows out by $837 million, with state government blaming global factorsThe Victorian government has conceded an almost billion dollar blowout in Melbourne's Metro Rail Tunnel project. In a snap mid-afternoon press conference on the eve of the AFL Grand Final public ...
An investigation has been launched into one of the state’s signature transport projects after the sacking of two union delegates.
Vital safety infrastructure that stops blind and vision-impaired people falling onto train tracks is missing from dozens of ...
It blamed the slide into loss, from a net profit of $94.8 million in 2023, on “project delivery issues” on Melbourne’s Metro Tunnel rail project and West Gate Tunnel motorway. John Holland ...
An investigation is underway into allegations a labour hire firm charged for shifts that were never worked on the Melbourne Metro Tunnel construction. Two CFMEU delegates have been sacked over the ...
Public transport boffins advised using an above-ground link that used Albion East’s rail corridor via Sunshine, connecting into a future Melbourne Metro Tunnel. The proposal was for a 25-minute ...
An artist’s render of the entrance to the Melbourne Metro Town Hall station in the City Square, which will no longer feature Burke and Wills. “Jimmy Cook almost got his head knocked off last w ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results