Construction that would have reduced NB I-5 to 2 lanes over Ship Canal Bridge postponed
The closures are part of WSDOT’s Revive I-5 work to replace concrete panels and expansion joints, resurface bridge decks, improve Ship Canal Bridge drainage and repair structural components on the bridge. Since 2019, the bridge has required more than 200 emergency repairs, and it was last resurfaced in 1985, according to WSDOT.